Georgia Tech – Klaus Advanced Computer Building
Originally conceived as aluminum louver in-fill supported by steel structural members, Peachtree engineers developed a system capable of achieving the 11’-6” cantilever using aluminum structure. To complete the design, the design team designed a three-part element that satisfy the architect’s desire for an 18” wide by 6″ deep fascia feature.
SATOC – Harmony Church & Sandhill Sites
The new training barracks complex at Fort Benning was developed on two sites totaling 182 acres and included Brigade Hqs, Battalion Hqs, a consolidated Battalion Dining Facility and Company Operations Facilities, all of which called for covered outdoor dining and entrance canopies of varying sizes.