Venice Elementary School
This new two-story elementary school was built on an existing campus which continued to operate during the construction. Peachtree’s team coordinated closely with the general contractor to insure a seamless installation process that presented no interruption to school activities.
Time Warner Regional Headquarters
At Time Warner’s Charlotte corporate campus which consists of three (3) office buildings and two (2) parking structures Peachtree worked closely with the design team to develop a cost effective walkway cover system that provides pedestrian shelter between the various buildings and parking decks. The canopy configuration blends well with the site’s landscape.