3255 S Sweetwater Rd, Lithia Springs, GA 30122

Monday-Friday - 8:00am - 5:00pm

(800) 341-3325

Bunche Middle School

About Project

The newly renovated Bunche Middle School facility consists of a new auditorium, gymnasium, academic and support spaces, and a renovated and relocated kitchen and cafeteria. Students are now able to enjoy a new natural grass football field that is used for soccer and lacrosse teams. Additionally, the middle school received a new 400 meter track, a new softball field, and reconfigured parking, drop-off and bus areas.

Location

Atlanta, GA

Market

K Thru 12

Product

Aluminum Walkway Covers & Canopies, Metal Wall Panels

Architect

COOPER CARRY

Contractor

J.E. DUNN CONSTRUCTION

Scope:

ACM Panel – 11,000 s.f. (surface area)
Extruded Aluminum Canopy – 3,600 s.f.

Features:

At the main entrance to school the building features two (2) large extruded aluminum canopies constructed from custom “column cluster” and custom support framing. The marquee eyebrow at the entrance is enhanced further by Aluminum Composite Materials (ACM) metal wall and soffits panels. Throughout the project ACM panels are used to wrap parapets, accent window headers and windows at the clerestory.

Finish:

Extruded Aluminum and ACM Panels – 2-coat Kynar in Standard Bone White color

Components:

ACM Panels – Reynobond’s 4MM FR Core ACM, PPC’s ES-600 – Exposed Sealant System
Walkway Cover – Columns – 6”x6”, Beams – 8″x4″ and 6″x6″, Deck – 3″ corrugated, Fascia – standard 8″